Fracture stimulation operations have been completed on the Earl #1-13 H, with all 20 stages pumped. The stimulation placed 2.1 million pounds of proppant. The flow back equipment will be moved from the Rodney well and operations will commence in 24 hours.
No comments:
Post a Comment